I'm talking to a PB about installing an inground 40*16 pool in my seriously sloped backyard.
It involves raising the yard by a few feet. The shallow part is currently above ground and the deep end is just 2.5 ft into the soil. This is before we fill the yard.
This all means that we'll bring in a lot of fill dirt to raise the level and the pool will mostly be buried in fill dirt. There will be a 3:1 slope from after the pool deck so we wont build retaining walls around the pool.
Are there...
Read more
It involves raising the yard by a few feet. The shallow part is currently above ground and the deep end is just 2.5 ft into the soil. This is before we fill the yard.
This all means that we'll bring in a lot of fill dirt to raise the level and the pool will mostly be buried in fill dirt. There will be a 3:1 slope from after the pool deck so we wont build retaining walls around the pool.
Are there...
Read more
No comments:
Post a Comment