The contractor just poured the deck on our pool last week and there are already a number of cracks. The joints were tooled, and the surface was stamped.
After stamping, they didn't wet the concrete, and didn't wet the ground beforehand either. The deck is 4" think.... no rebar. The edge against the pool has an automated cover track.
We did mist the deck the next day, but by that point it was already cracked. That morning, the deck was almost solid white with efflorence (last 3 photos...
Read more
After stamping, they didn't wet the concrete, and didn't wet the ground beforehand either. The deck is 4" think.... no rebar. The edge against the pool has an automated cover track.
We did mist the deck the next day, but by that point it was already cracked. That morning, the deck was almost solid white with efflorence (last 3 photos...
Read more